400 MW onshore wind in northern Lithuania

Our largest onshore wind project in development: 160 m hubs and a planned 330 kV connection, with a 200 MW battery and a 200 MW data center site developed alongside in the same region.

400 MWplanned capacity
63wind turbines
160 mhub height
~172 mrotor diameter
330 kVplanned connection
EIAin progress
Integrated site

Can be acquired together

This project shares its location with other projects of ours. Each can be bought on its own, or as one package.

Northern Lithuania

Generation, storage and load on one site

A 200 MW data center site, our 400 MW flagship wind project and a 200 MW battery project in the same location – offered individually or together as one integrated package.

Ask about the package
Development status

Where the project actually stands

"Ready to build" is a market label, not a legal status – so here is every item and where it stands. This project is in development, not ready to build. Land control and zoning are complete; the environmental impact assessment has started and the grid connection is in progress (400 MW at 330 kV potential), followed by construction permitting.

  1. Land controlComplete

    Land agreements signed for the turbine positions

  2. ZoningComplete

    Territorial planning complete

  3. EnvironmentalIn progress

    Environmental impact assessment started, completion expected 2027

  4. Grid connectionIn progress

    In progress – 400 MW at 330 kV potential

  5. Building permitNot started

    Follows the grid connection

Grid and capacity

Planned capacity
400 MW
Voltage
330 kV (planned)
Hub height
160 m
Rotor diameter
~172 m
Nearby
200 MW BESS and a 200 MW data center site in the same region

Site

Location
Northern Lithuania
Terrain
Flat agricultural land
Land
Parcels under long-term agreements
Access
Existing regional road network
Timeline

From here to operation

  1. NowEnvironmental impact assessment
  2. 2027 H1Environmental assessment completed
  3. 2028Construction permitting · ready to build
  4. 2028Construction start

What is in the data room

  • Corporate documents of the project company
  • Land agreements and parcel register
  • Grid connection conditions
  • Wind measurement and yield assessment
  • Environmental assessment documentation
  • Turbine layout and coordinates
  • Project timeline