Contact us
Home / Data centers / Data center site – Northern Lithuania

200 MW data center site in northern Lithuania, grid conditions secured

Land, grid capacity and permits in one project company, sold ready to build: 200 MW with grid connection conditions secured at 330 kV, next to our own wind and battery projects in development.

200 MWgrid conditions secured, 330 kV
2026 Q4grid agreement
2028 Q1EIA decision
2028 Q2ready to build
2.4 kmto the connection point
30.35 haland
Integrated site

Can be acquired together

This project shares its location with other projects of ours. Each can be bought on its own, or as one package.

Northern Lithuania

Generation, storage and load on one site

A 200 MW data center site, our 400 MW flagship wind project and a 200 MW battery project in the same location – offered individually or together as one integrated package.

Ask about the package
Development status

Where the project actually stands

"Ready to build" is a market label, not a legal status – so here is every item and where it stands. Ready to build (target 2028 Q2) means: land title secured, 200 MW grid connection agreement signed at 330 kV, EIA decision received, land-use change approved, technical and architectural design completed and the building permit issued. Today the land title and the grid connection conditions are secured and the grid agreement is under way; the EIA decision is expected in 2028 Q1.

  1. Land controlComplete

    Land title secured

  2. ZoningIn progress

    Land-use change in progress

  3. EnvironmentalNot started

    EIA decision expected 2028 Q1

  4. Grid connectionIn progress

    200 MW conditions secured at 330 kV · grid agreement under way

  5. Building permitNot started

    Building and grid connection part to follow · ready to build 2028 Q2

Grid and capacity

Grid conditions secured
200 MW at 330 kV
Distance to substation
2.4 km
Reinforcements
None required
Grid agreement
To be signed 2026 Q4
Ready to build
2028 Q2

Site

Land
30.35 ha, privately held
Land use
Change in progress
Height limit
20 m
Access
Paved road at the site · highway next to the site
Water
Underground water access for cooling
Fiber
Two fibre-optic networks on or next to the site
Gas
No gas pipeline nearby
Next to it
Our own wind and battery projects in development · PPA or direct-line option
Timeline

From here to operation

  1. NowGrid connection conditions secured · grid agreement
  2. 2028 Q1EIA decision
  3. 2028 Q2Building permits · ready to build
  4. 2029 Q2Construction and grid connection

What is in the data room

  • Corporate documents of the project company
  • Land agreements and cadastral extracts
  • Zoning and detailed plan decisions
  • Grid connection conditions and capacity allocation
  • Environmental assessment documentation
  • Technical site studies and master plan
  • Project timeline

Who to talk to

Energy Unlimited

Our development team handles data room and buyer enquiries for this project.