200 MW data center site in northern Lithuania, grid conditions secured
Land, grid capacity and permits in one project company, sold ready to build: 200 MW with grid connection conditions secured at 330 kV, next to our own wind and battery projects in development.
Can be acquired together
This project shares its location with other projects of ours. Each can be bought on its own, or as one package.
Generation, storage and load on one site
A 200 MW data center site, our 400 MW flagship wind project and a 200 MW battery project in the same location – offered individually or together as one integrated package.
Ask about the packageWhere the project actually stands
"Ready to build" is a market label, not a legal status – so here is every item and where it stands. Ready to build (target 2028 Q2) means: land title secured, 200 MW grid connection agreement signed at 330 kV, EIA decision received, land-use change approved, technical and architectural design completed and the building permit issued. Today the land title and the grid connection conditions are secured and the grid agreement is under way; the EIA decision is expected in 2028 Q1.
- Land controlComplete
Land title secured
- ZoningIn progress
Land-use change in progress
- EnvironmentalNot started
EIA decision expected 2028 Q1
- Grid connectionIn progress
200 MW conditions secured at 330 kV · grid agreement under way
- Building permitNot started
Building and grid connection part to follow · ready to build 2028 Q2
Grid and capacity
- Grid conditions secured
- 200 MW at 330 kV
- Distance to substation
- 2.4 km
- Reinforcements
- None required
- Grid agreement
- To be signed 2026 Q4
- Ready to build
- 2028 Q2
Site
- Land
- 30.35 ha, privately held
- Land use
- Change in progress
- Height limit
- 20 m
- Access
- Paved road at the site · highway next to the site
- Water
- Underground water access for cooling
- Fiber
- Two fibre-optic networks on or next to the site
- Gas
- No gas pipeline nearby
- Next to it
- Our own wind and battery projects in development · PPA or direct-line option
From here to operation
- NowGrid connection conditions secured · grid agreement
- 2028 Q1EIA decision
- 2028 Q2Building permits · ready to build
- 2029 Q2Construction and grid connection
What is in the data room
- Corporate documents of the project company
- Land agreements and cadastral extracts
- Zoning and detailed plan decisions
- Grid connection conditions and capacity allocation
- Environmental assessment documentation
- Technical site studies and master plan
- Project timeline
Who to talk to

Our development team handles data room and buyer enquiries for this project.