70 MW data center site in a Lithuanian free economic zone, grid secured

Land, grid capacity and permits in one project company, sold ready to build: 70 MW with a signed 110 kV grid agreement, on a campus in a free economic zone with 0% corporate tax for 10 years.

70 MWsigned 110 kV grid agreement
2027 Q2ready to build
2028 Q2grid connection completed
2028 Q4construction completed
1.8 kmto the connection point
0%corporate tax, 10 years
The offer

What is offered

Capacity
70 MW at 110 kV, signed grid agreement
Land
Part of the 14.4 ha campus, industrial land use
Zone
Free economic zone – 0% corporate tax, 10 yrs
Grid
1.8 km to the substation, no reinforcements
Timeline
Ready to build 2027 Q2 · grid connection 2028 Q2 · construction completed 2028 Q4
Next to it
A further 200 MW site, grid conditions secured at 330 kV
Environmental
EIA screening under way, decision expected 2027 Q1
Structure
SPV share sale · data room on request
The campus

The 70 MW site on the campus

Development status

Where the project actually stands

"Ready to build" is a market label, not a legal status – so here is every item and where it stands. Ready to build (2027 Q2) means: land secured, 70 MW grid connection agreement signed at 110 kV, EIA screening decision received and the building permits for the building and the grid connection issued. Technical design follows in 2027 Q3 and construction starts in 2027 Q4.

  1. Land controlComplete

    Land purchase agreement signed

  2. ZoningComplete

    Industrial land use

  3. EnvironmentalIn progress

    EIA screening under way · decision expected 2027 Q1

  4. Grid connectionComplete

    70 MW agreement signed at 110 kV · grid design expected 2027 Q1

  5. Building permitIn progress

    Building and grid connection part expected 2027 Q2 · technical design 2027 Q3

Grid and capacity

Grid secured
70 MW at 110 kV, agreement signed
Distance to substation
1.8 km
Reinforcements
None required
Ready to build
2027 Q2
Grid connection completed
2028 Q2

Site

Land
Part of a 14.4 ha campus, industrial land use
Height limit
30 m
Zone
Free economic zone – 0% corporate tax for 10 years
Access
Paved road at the site · main highway 4.2 km
Water
Underground water access for cooling
Fiber
Two separate fibre-optic networks, 2.4 km from the site boundary
Gas
Medium-pressure pipeline (up to 5 bar), 0.8 km
Heat transfer
Opportunity to supply excess heat to the city district heating network, 3.6 km away (2024: 86 MW average, 277 MW peak heat demand)
Timeline

From here to operation

  1. 2027 Q1EIA screening decision · grid design
  2. 2027 Q2Building permits · ready to build
  3. 2027 Q4Construction start
  4. 2028 Q2–Q4Grid connection (Q2) · construction completed (Q4)

What is in the data room

  • Corporate documents of the project company
  • Land agreements and cadastral extracts
  • Zoning and detailed plan decisions
  • Grid connection conditions and capacity allocation
  • Environmental assessment documentation
  • Technical site studies and master plan
  • Project timeline