70 MW data center site in a Lithuanian free economic zone, grid secured
Land, grid capacity and permits in one project company, sold ready to build: 70 MW with a signed 110 kV grid agreement, on a campus in a free economic zone with 0% corporate tax for 10 years.
What is offered
- Capacity
- 70 MW at 110 kV, signed grid agreement
- Land
- Part of the 14.4 ha campus, industrial land use
- Zone
- Free economic zone – 0% corporate tax, 10 yrs
- Grid
- 1.8 km to the substation, no reinforcements
- Timeline
- Ready to build 2027 Q2 · grid connection 2028 Q2 · construction completed 2028 Q4
- Next to it
- A further 200 MW site, grid conditions secured at 330 kV
- Environmental
- EIA screening under way, decision expected 2027 Q1
- Structure
- SPV share sale · data room on request
The 70 MW site on the campus
Where the project actually stands
"Ready to build" is a market label, not a legal status – so here is every item and where it stands. Ready to build (2027 Q2) means: land secured, 70 MW grid connection agreement signed at 110 kV, EIA screening decision received and the building permits for the building and the grid connection issued. Technical design follows in 2027 Q3 and construction starts in 2027 Q4.
- Land controlComplete
Land purchase agreement signed
- ZoningComplete
Industrial land use
- EnvironmentalIn progress
EIA screening under way · decision expected 2027 Q1
- Grid connectionComplete
70 MW agreement signed at 110 kV · grid design expected 2027 Q1
- Building permitIn progress
Building and grid connection part expected 2027 Q2 · technical design 2027 Q3
Grid and capacity
- Grid secured
- 70 MW at 110 kV, agreement signed
- Distance to substation
- 1.8 km
- Reinforcements
- None required
- Ready to build
- 2027 Q2
- Grid connection completed
- 2028 Q2
Site
- Land
- Part of a 14.4 ha campus, industrial land use
- Height limit
- 30 m
- Zone
- Free economic zone – 0% corporate tax for 10 years
- Access
- Paved road at the site · main highway 4.2 km
- Water
- Underground water access for cooling
- Fiber
- Two separate fibre-optic networks, 2.4 km from the site boundary
- Gas
- Medium-pressure pipeline (up to 5 bar), 0.8 km
- Heat transfer
- Opportunity to supply excess heat to the city district heating network, 3.6 km away (2024: 86 MW average, 277 MW peak heat demand)
From here to operation
- 2027 Q1EIA screening decision · grid design
- 2027 Q2Building permits · ready to build
- 2027 Q4Construction start
- 2028 Q2–Q4Grid connection (Q2) · construction completed (Q4)
What is in the data room
- Corporate documents of the project company
- Land agreements and cadastral extracts
- Zoning and detailed plan decisions
- Grid connection conditions and capacity allocation
- Environmental assessment documentation
- Technical site studies and master plan
- Project timeline
Who to talk to

Our development team handles data room and buyer enquiries for this project.