200 MW data center site in a Lithuanian free economic zone, grid conditions secured

Land, grid capacity and permits in one project company, sold ready to build: 200 MW with grid connection conditions secured at 330 kV, on a campus in a free economic zone with 0% corporate tax for 10 years.

200 MWgrid conditions secured, 330 kV
2027 Q4EIA decision
2028 Q1ready to build
2029 Q1construction and grid connection
6.2 kmto the connection point
0%corporate tax, 10 years
The offer

What is offered

Capacity
200 MW at 330 kV, grid connection conditions secured
Land
Part of the 14.4 ha campus, industrial land use
Zone
Free economic zone – 0% corporate tax, 10 yrs
Grid
6.2 km to the 330 kV substation, no reinforcements
Timeline
Ready to build 2028 Q1
Next to it
70 MW site with a signed 110 kV grid agreement
Environmental
EIA decision expected 2027 Q4
Structure
SPV share sale · data room on request
The campus

The 200 MW site on the campus

Development status

Where the project actually stands

"Ready to build" is a market label, not a legal status – so here is every item and where it stands. Ready to build (target 2028 Q1) means: land secured, 200 MW grid connection agreement signed at 330 kV, EIA decision received and the building permits for the building and the grid connection issued. Today the grid connection conditions are secured and the grid agreement is under way; the EIA decision is expected in 2027 Q4, followed by design and permitting.

  1. Land controlComplete

    Part of the 14.4 ha campus

  2. ZoningComplete

    Industrial land use

  3. EnvironmentalNot started

    EIA decision expected 2027 Q4

  4. Grid connectionIn progress

    200 MW conditions secured at 330 kV · grid agreement under way

  5. Building permitNot started

    Building and grid connection part to follow · ready to build 2028 Q1

Grid and capacity

Grid conditions secured
200 MW at 330 kV
Distance to substation
6.2 km
Reinforcements
None required
Ready to build
2028 Q1

Site

Land
Part of a 14.4 ha campus, industrial land use
Height limit
30 m
Zone
Free economic zone – 0% corporate tax for 10 years
Access
Paved road at the site · main highway 4.2 km
Water
Underground water access for cooling
Fiber
Two separate fibre-optic networks, 2.4 km from the site boundary
Gas
Medium-pressure pipeline (up to 5 bar), 0.8 km
Heat transfer
Opportunity to supply excess heat to the city district heating network, 3.6 km away (2024: 86 MW average, 277 MW peak heat demand)
Timeline

From here to operation

  1. NowGrid connection conditions secured · grid agreement
  2. 2027 Q4EIA decision
  3. 2028 Q1Building permits · ready to build
  4. 2029 Q1Construction and grid connection

What is in the data room

  • Corporate documents of the project company
  • Land agreements and cadastral extracts
  • Zoning and detailed plan decisions
  • Grid connection conditions and capacity allocation
  • Environmental assessment documentation
  • Technical site studies and master plan
  • Project timeline

Who to talk to

Energy Unlimited

Our development team handles data room and buyer enquiries for this project.