Contact us
Home / Battery storage / Battery storage – Southern Lithuania

140 MW battery storage project in southern Lithuania

A 140 MW battery project at transmission level, with grid capacity approved in the transmission operator's reservation cycle.

140 MWpower
280 MWhenergy
2 hduration
Transmissionconnection level
Approvedgrid reservation
2028target ready to build
Development status

Where the project actually stands

"Ready to build" is a market label, not a legal status – so here is every item and where it stands. This project is in development, not ready to build. Land control and zoning are complete, grid capacity has been approved in the transmission system operator's reservation cycle and the grid connection is in progress; the building permit follows the grid connection.

  1. Land controlComplete

    Land agreement signed

  2. ZoningComplete

    Zoning complete

  3. Grid connectionIn progress

    Connection in progress

  4. Building permitNot started

    Follows the grid connection

Grid and capacity

Planned capacity
140 MW
Connection level
Transmission
Region
Southern Lithuania
Status
See development status above
Structure
Share sale of the project company
Acquisition
Possible at any stage of development

Site

Region
Southern Lithuania
Capacity
140 MW
Land
Land agreement signed
Terrain
Agricultural land
Access
Existing road network
Timeline

From here to operation

  1. NowGrid connection
  2. 2028Target ready to build
  3. 2028Construction start

What is in the data room

  • Corporate documents of the project company
  • Land agreements and cadastral extracts
  • Zoning documentation
  • Grid connection application and conditions
  • Technical solution and layout
  • Project timeline

Who to talk to

Energy Unlimited

Our development team handles data room and buyer enquiries for this project.